Taiwan Tati Cultural and Educational Foundation

 
  • Increase font size
  • Default font size
  • Decrease font size
Home The News News

News

Europe could do more to ’deter attack’ on Taiwan

European countries could help deter a Chinese attack on Taiwan by conducting military exercises with Taipei and joining the US in imposing sanctions against China, former NATO secretary-general and former Danish prime minister Anders Fogh Rasmussen said in Taipei yesterday.

“The most important supplier of weapons and military assistance to Taiwan will be the US. However, to prevent a possible Chinese attack against Taiwan, European countries could assist in different ways,” Rasmussen said.

Read more...
 
 

Taiwan built sub to be tested from September

A prototype of Taiwan’s first locally built submarine is set to begin testing in September, marking a milestone in the nation’s Indigenous Defense Submarine program, CSBC Corp, Taiwan (台船) chairman Cheng Wen-lon (鄭文隆) said yesterday.

The construction of the prototype has continued around the clock after overcoming a series of difficulties thanks to the cooperation of the Naval Shipbuilding Development Center, the navy’s 256th Submarine Squadron and a CSBC task force, Cheng said.

Read more...
 


Page 90 of 1481

Newsflash


Democratic Progressive Party legislators Yao Wen-chih, left, and Tien Chiu-chin, center, with Green Consumers’ Foundation chairman Jay Fang, hold a press conference outside the legislature in Taipei yesterday, calling on the government to suspend the operation of the Guosheng Nuclear Power Plant in Wanli District, New Taipei City, to allow a safety inspection.
Photo: Chien Jung-fong, Taipei Times

Environmental protection groups and legislators yesterday urged the Atomic Energy Council to reject a proposal by Taiwan Power Co (Taipower) to resume operations at the No. 1 reactor of the Guosheng Nuclear Power Plant in Wanli District (萬里), New Taipei City (新北市), saying that it should first explain why seven anchor bolts of the reactor were damaged.

During a temporary shutdown on March 16 for routine maintenance of the reactor, problems were discovered with some of the anchor bolts used to secure the bottom of the reactor to the steel-reinforced concrete substrate.